2009Shanxi HydrotechnicsRequires access

Excavation Technique and Construction Management of Xuao Tunnel

Duan Jian-ju

Open publisher page 0 citations

Abstract

The construction section of Xuao Tunnel is 2063.5m in length.It is the key section to control the construction period,and has following features: long length of tunnel,small cross section,few working face,short construction period,many construction difficulities etc.The article briefly introduces the excavation technique and construction management of inlet section of Xuao Tunnel,and indicates the main guide thinking through the whole construction process is economical,practical and effective.

About this research paper

What this paper is about

The construction section of Xuao Tunnel is 2063.5m in length.It is the key section to control the construction period,and has following features: long length of tunnel,small cross section,few working face,short construction period,many construction difficulities etc.The article briefly introduces the excavation technique and construction management of inlet section of Xuao Tunnel,and indicates the main guide thinking through the whole construction process is economical,practical and effective.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction section of Xuao Tunnel is 2063.5m in length.It is the key section to control the construction period,and has following features: long length of tunnel,small cross section,few working face,short construction period,many construction difficulities etc.The article briefly introduces the excavation technique and construction management of inlet section of Xuao Tunnel,and indicates the main guide thinking through the whole construction process is economical,practical and effective.

Key concepts: Excavation, Section (typography), Tunnel construction, Engineering, Construction management, Civil engineering, Process (computing), Construction engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Excavation Technique and Construction Management of Xuao Tunnel — Research Paper | ScholarLens