2009•Journal of North China Institute of Water Conservancy and Hydroelectric PowerRequires access

Impact of the Sixth Integrated Water Regulation of Yellow River on Reach from Huayuankou Station to Jiahetan Station

Ying Liu

Open publisher page 0 citations

Abstract

The course of the 2007 integrated water regulation of the Yellow River is described,then the impact of the integrated water regulation to the reach from Huayuankou station to Jiahetan station before the flood season is focused on,in terms of analyzing the hydrological process of sediment,the changed size of suspended load before and after the regulation,the scour of river flow and the ability to change the main channel,and soon.The results show that there is about 4.101×109 m3 water going through the Huayuankou hydrometric station,and about 4.1×106 tons of sediment is sent to the downstream of Jiahetan hydrometric station.The increased flow capacity of two hydrometric stations range 300 m3/s to 500 m3/s,and the corresponding stages drop 0.03~0.14 m with 3 000 m3/h flow capacity.It is obvious that the rate of sediment discharge is improved.

About this research paper

What this paper is about

The course of the 2007 integrated water regulation of the Yellow River is described,then the impact of the integrated water regulation to the reach from Huayuankou station to Jiahetan station before the flood season is focused on,in terms of analyzing the hydrological process of sediment,the changed size of suspended load before and after the regulation,the scour of river flow and the ability to change the main channel,and soon.The results show that there is about 4.101×109 m3 water going through the Huayuankou hydrometric station,and about 4.1×106 tons of sediment is sent to the downstream of Jiahetan hydrometric station.The increased flow capacity of two hydrometric stations range 300 m3/s to 500 m3/s,and the corresponding stages drop 0.03~0.14 m with 3 000 m3/h flow capacity.It is obvious that the rate of sediment discharge is improved.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The course of the 2007 integrated water regulation of the Yellow River is described,then the impact of the integrated water regulation to the reach from Huayuankou station to Jiahetan station before the flood season is focused on,in terms of analyzing the hydrological process of sediment,the changed size of suspended load before and after the regulation,the scour of river flow and the ability to change the main channel,and soon.The results show that there is about 4.101×109 m3 water going through the Huayuankou hydrometric station,and about 4.1×106 tons of sediment is sent to the downstream of Jiahetan hydrometric station.The increased flow capacity of two hydrometric stations range 300 m3/s to 500 m3/s,and the corresponding stages drop 0.03~0.14 m with 3 000 m3/h flow capacity.It is obvious that the rate of sediment discharge is improved.

Key concepts: Hydrology (agriculture), Environmental science, Channel (broadcasting), Sediment, River regime, Flow (mathematics), Downstream (manufacturing), Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Impact of the Sixth Integrated Water Regulation of Yellow River on Reach from Huayuankou Station to Jiahetan Station — Research Paper | ScholarLens