2011Journal of Yangtze River Scientific Research InstituteRequires access

Physical Modeling of Morphological Changes in Tiaoguan Bend Reach of Jingjiang River at the Initial Operation Stage of Three Gorges Project

Yonghui Zhu

Open publisher page 0 citations

Abstract

Both the process and the amount of the water and sediment load flowing into the Jingjiang river reach downstream of the Three Gorges Project(TGP) have changed significantly due to the regulation and storage of the reservoir.Conspicuous erosion in Jingjiang river channel has resulted in river regime changes in parts of the reach,and will consequently influence the embankments and bank protection works along both sides,the river regulation projects and the stability of riverbed,thereby further affecting the flood control,navigation,ecology,environment and the integrated service function of the river in these areas.In this study,movable bed model of the Changjiang River Flood Protection Physical Model was used to study the changes of erosion and sedimentation in this reach at the initial operation stage of TGP.The tendency of river regime changes were predicted as well.Research results will offer technical reference for the planning and design of river regulation and river regime control projects in this river course.

About this research paper

What this paper is about

Both the process and the amount of the water and sediment load flowing into the Jingjiang river reach downstream of the Three Gorges Project(TGP) have changed significantly due to the regulation and storage of the reservoir.Conspicuous erosion in Jingjiang river channel has resulted in river regime changes in parts of the reach,and will consequently influence the embankments and bank protection works along both sides,the river regulation projects and the stability of riverbed,thereby further affecting the flood control,navigation,ecology,environment and the integrated service function of the river in these areas.In this study,movable bed model of the Changjiang River Flood Protection Physical Model was used to study the changes of erosion and sedimentation in this reach at the initial operation stage of TGP.The tendency of river regime changes were predicted as well.Research results will offer technical reference for the planning and design of river regulation and river regime control projects in this river course.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Both the process and the amount of the water and sediment load flowing into the Jingjiang river reach downstream of the Three Gorges Project(TGP) have changed significantly due to the regulation and storage of the reservoir.Conspicuous erosion in Jingjiang river channel has resulted in river regime changes in parts of the reach,and will consequently influence the embankments and bank protection works along both sides,the river regulation projects and the stability of riverbed,thereby further affecting the flood control,navigation,ecology,environment and the integrated service function of the river in these areas.In this study,movable bed model of the Changjiang River Flood Protection Physical Model was used to study the changes of erosion and sedimentation in this reach at the initial operation stage of TGP.The tendency of river regime changes were predicted as well.Research results will offer technical reference for the planning and design of river regulation and river regime control projects in this river course.

Key concepts: Three gorges, River regime, Hydrology (agriculture), Stage (stratigraphy), Sedimentation, Channel (broadcasting), Flood control, Flood myth

Related papers

Back to paper searchBrowse research topicsOriginal source
Physical Modeling of Morphological Changes in Tiaoguan Bend Reach of Jingjiang River at the Initial Operation Stage of Three Gorges Project — Research Paper | ScholarLens