2007Water Resources & Hydropower of Northeast ChinaRequires access

Excavation and treatment of foundation in Shuanggou dam

Yanhu Wang

Open publisher page 0 citations

Abstract

Shuanggou rockfill dam with facing is located in the gorge.The construction scheme suited to geological and topographical condition in toe slab area is designed in the design of dam foundation excavation.The treatment measures of dam foundation are adopted according to exposed bad ground surface feature and geological defect for meet the project demand.

About this research paper

What this paper is about

Shuanggou rockfill dam with facing is located in the gorge.The construction scheme suited to geological and topographical condition in toe slab area is designed in the design of dam foundation excavation.The treatment measures of dam foundation are adopted according to exposed bad ground surface feature and geological defect for meet the project demand.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Shuanggou rockfill dam with facing is located in the gorge.The construction scheme suited to geological and topographical condition in toe slab area is designed in the design of dam foundation excavation.The treatment measures of dam foundation are adopted according to exposed bad ground surface feature and geological defect for meet the project demand.

Key concepts: Excavation, Foundation (evidence), Feature (linguistics), Geology, Geotechnical engineering, Slab, Forensic engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Excavation and treatment of foundation in Shuanggou dam — Research Paper | ScholarLens