Multi-reentrant manufacturing system scheduling based on layered bottleneck analysis

Yanan Dai

Open publisher page 2 citations

Abstract

Referring to Drum-Buffer-Rope(DBR)theory,a novel scheduling strategy with the core of bottleneck equipment control was designed for a kind of complex manufacturing system with multi-reentrant flows.For bottleneck identification,the concept of layered bottleneck was presented,and the calculation methods of system bottleneck and sub-layer bottlenecks were discussed.Based on layered bottleneck thoughtway,the Different Layers Scheduling(DLS)algorithm and its implementation procedures for multi-reentrant manufacturing systems were further explored.Finally,HP-24 semiconductor production line was used as an example to demonstrate the effectiveness of the proposed methods.

About this research paper

What this paper is about

Referring to Drum-Buffer-Rope(DBR)theory,a novel scheduling strategy with the core of bottleneck equipment control was designed for a kind of complex manufacturing system with multi-reentrant flows.For bottleneck identification,the concept of layered bottleneck was presented,and the calculation methods of system bottleneck and sub-layer bottlenecks were discussed.Based on layered bottleneck thoughtway,the Different Layers Scheduling(DLS)algorithm and its implementation procedures for multi-reentrant manufacturing systems were further explored.Finally,HP-24 semiconductor production line was used as an example to demonstrate the effectiveness of the proposed methods.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Referring to Drum-Buffer-Rope(DBR)theory,a novel scheduling strategy with the core of bottleneck equipment control was designed for a kind of complex manufacturing system with multi-reentrant flows.For bottleneck identification,the concept of layered bottleneck was presented,and the calculation methods of system bottleneck and sub-layer bottlenecks were discussed.Based on layered bottleneck thoughtway,the Different Layers Scheduling(DLS)algorithm and its implementation procedures for multi-reentrant manufacturing systems were further explored.Finally,HP-24 semiconductor production line was used as an example to demonstrate the effectiveness of the proposed methods.

Key concepts: Bottleneck, Reentrancy, Scheduling (production processes), Computer science, Distributed computing, Production control, Semiconductor device fabrication, Job shop scheduling