2013IEEE Transactions on Semiconductor ManufacturingRequires access

Layered Drum-Buffer-Rope-Based Scheduling of Reentrant Manufacturing Systems

Fei Qiao, Qidi Wu

Open publisher page 10 citations

Abstract

Reentrant flow is a phenomenon in which a product revisits several machines multiple times on its production route. A manufacturing system with reentrant flow is well recognized as a highly complex system. Its reentrance feature challenges the scheduling researchers. To cope with this problem, a kind of drum-buffer-rope (DBR) technique proves to be a viable robust method for complex manufacturing system scheduling. This paper investigates DBR-based scheduling for reentrant manufacturing with a novel strategy. First, the multiple reentrant production flow is transferred into nonreentrant layer production lines. Then, the DBR-based scheduling algorithm is studied, and a layered scheduling algorithm (LSA) and the extended LSA are proposed. The proposed layered DBR-based scheduling strategy and the algorithms are demonstrated via a case study. They significantly outperform some commonly used policies in terms of such performance measures as mean cycle time, work-in-process, and equipment utilization ratios.

About this research paper

What this paper is about

Reentrant flow is a phenomenon in which a product revisits several machines multiple times on its production route. A manufacturing system with reentrant flow is well recognized as a highly complex system. Its reentrance feature challenges the scheduling researchers. To cope with this problem, a kind of drum-buffer-rope (DBR) technique proves to be a viable robust method for complex manufacturing system scheduling. This paper investigates DBR-based scheduling for reentrant manufacturing with a novel strategy. First, the multiple reentrant production flow is transferred into nonreentrant layer production lines. Then, the DBR-based scheduling algorithm is studied, and a layered scheduling algorithm (LSA) and the extended LSA are proposed. The proposed layered DBR-based scheduling strategy and the algorithms are demonstrated via a case study. They significantly outperform some commonly used policies in terms of such performance measures as mean cycle time, work-in-process, and equipment utilization ratios.

Why it matters

OpenAlex reports 10 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Reentrant flow is a phenomenon in which a product revisits several machines multiple times on its production route. A manufacturing system with reentrant flow is well recognized as a highly complex system. Its reentrance feature challenges the scheduling researchers. To cope with this problem, a kind of drum-buffer-rope (DBR) technique proves to be a viable robust method for complex manufacturing system scheduling. This paper investigates DBR-based scheduling for reentrant manufacturing with a novel strategy. First, the multiple reentrant production flow is transferred into nonreentrant layer production lines. Then, the DBR-based scheduling algorithm is studied, and a layered scheduling algorithm (LSA) and the extended LSA are proposed. The proposed layered DBR-based scheduling strategy and the algorithms are demonstrated via a case study. They significantly outperform some commonly used policies in terms of such performance measures as mean cycle time, work-in-process, and equipment utilization ratios.

Key concepts: Reentrancy, Scheduling (production processes), Computer science, Flow shop scheduling, Fair-share scheduling, Distributed computing, Dynamic priority scheduling, Drum

Related papers

Back to paper searchBrowse research topicsOriginal source
Layered Drum-Buffer-Rope-Based Scheduling of Reentrant Manufacturing Systems — Research Paper | ScholarLens