In order to solve the technical problem that whether ventilation shafts are needed to set up or not in upstream tunnel when the air inflow and outflow are imbalanced in the large longitudinal slope double-hole tunnel,Dabie Mountain Highway Tunnel was selected as an entity engineering for analysis.The CO concentration,visibility index,and air velocity in the complementary network ventilation tunnel were tested on site,and the effect and existing problem of ventilation channel in the double-hole complimentary network ventilation system were analyzed.Test result indicates that the complimentary network ventilation can meet the control criteria of contaminant concentration.Two ventilation channels can play the role of airflow bi-direction exchange,and the exchanged air volume can meet design requirement,therefore,the complementary ventilation plan is feasible.When ventilation loads in upstream and downstream tunnels are imbalanced,the complementary ventilation can be used instead of ventilation shaft in upstream tunnel for large longitudinal slope extra-long tunnel.4tabs,7figs,16 refs.

About this research paper

What this paper is about

In order to solve the technical problem that whether ventilation shafts are needed to set up or not in upstream tunnel when the air inflow and outflow are imbalanced in the large longitudinal slope double-hole tunnel,Dabie Mountain Highway Tunnel was selected as an entity engineering for analysis.The CO concentration,visibility index,and air velocity in the complementary network ventilation tunnel were tested on site,and the effect and existing problem of ventilation channel in the double-hole complimentary network ventilation system were analyzed.Test result indicates that the complimentary network ventilation can meet the control criteria of contaminant concentration.Two ventilation channels can play the role of airflow bi-direction exchange,and the exchanged air volume can meet design requirement,therefore,the complementary ventilation plan is feasible.When ventilation loads in upstream and downstream tunnels are imbalanced,the complementary ventilation can be used instead of ventilation shaft in upstream tunnel for large longitudinal slope extra-long tunnel.4tabs,7figs,16 refs.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to solve the technical problem that whether ventilation shafts are needed to set up or not in upstream tunnel when the air inflow and outflow are imbalanced in the large longitudinal slope double-hole tunnel,Dabie Mountain Highway Tunnel was selected as an entity engineering for analysis.The CO concentration,visibility index,and air velocity in the complementary network ventilation tunnel were tested on site,and the effect and existing problem of ventilation channel in the double-hole complimentary network ventilation system were analyzed.Test result indicates that the complimentary network ventilation can meet the control criteria of contaminant concentration.Two ventilation channels can play the role of airflow bi-direction exchange,and the exchanged air volume can meet design requirement,therefore,the complementary ventilation plan is feasible.When ventilation loads in upstream and downstream tunnels are imbalanced,the complementary ventilation can be used instead of ventilation shaft in upstream tunnel for large longitudinal slope extra-long tunnel.4tabs,7figs,16 refs.

Key concepts: Ventilation (architecture), Airflow, Inflow, Upstream (networking), Marine engineering, Visibility, Engineering, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Complementary ventilation operational test in large longitudinal slope double-hole tunnel — Research Paper | ScholarLens