Complementary ventilation operational test in large longitudinal slope double-hole tunnel
Wang Ya-qion
Abstract
Wang Ya-qion
Abstract
In order to solve the technical problem that whether ventilation shafts are needed to set up or not in upstream tunnel when the air inflow and outflow are imbalanced in the large longitudinal slope double-hole tunnel,Dabie Mountain Highway Tunnel was selected as an entity engineering for analysis.The CO concentration,visibility index,and air velocity in the complementary network ventilation tunnel were tested on site,and the effect and existing problem of ventilation channel in the double-hole complimentary network ventilation system were analyzed.Test result indicates that the complimentary network ventilation can meet the control criteria of contaminant concentration.Two ventilation channels can play the role of airflow bi-direction exchange,and the exchanged air volume can meet design requirement,therefore,the complementary ventilation plan is feasible.When ventilation loads in upstream and downstream tunnels are imbalanced,the complementary ventilation can be used instead of ventilation shaft in upstream tunnel for large longitudinal slope extra-long tunnel.4tabs,7figs,16 refs.
OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In order to solve the technical problem that whether ventilation shafts are needed to set up or not in upstream tunnel when the air inflow and outflow are imbalanced in the large longitudinal slope double-hole tunnel,Dabie Mountain Highway Tunnel was selected as an entity engineering for analysis.The CO concentration,visibility index,and air velocity in the complementary network ventilation tunnel were tested on site,and the effect and existing problem of ventilation channel in the double-hole complimentary network ventilation system were analyzed.Test result indicates that the complimentary network ventilation can meet the control criteria of contaminant concentration.Two ventilation channels can play the role of airflow bi-direction exchange,and the exchanged air volume can meet design requirement,therefore,the complementary ventilation plan is feasible.When ventilation loads in upstream and downstream tunnels are imbalanced,the complementary ventilation can be used instead of ventilation shaft in upstream tunnel for large longitudinal slope extra-long tunnel.4tabs,7figs,16 refs.
Key concepts: Ventilation (architecture), Airflow, Inflow, Upstream (networking), Marine engineering, Visibility, Engineering, Environmental science