Research purposes: Two sets of TB880E TBM manufactured by German Wirth Corporation were introduced in 1997 by the Railway Ministry. These machines’ structures and technical data were designed according to Qinling Super Long Tunnel of Xi’an-Ankang Railway, which were applicable to excavating construction of hard rock tunnel, that was, Open Hard Rock Tunnel Boring Machine (TBM). It is still a difficult problem suffering the world to excavate through the soft surrounding rock. Research methods:This paper researched the preventive measures and construction methods on TBM construction accidents in terms of Taohuapu No.1 tunnel construction practice of Xi’an-Nanjing Railway. Research conclusions:This paper proposed a 20-Chinese-word principle, “Advance prediction, lining construction, data adjustment, proper promotion, and disturbance reduction”. How to deal with landslide was also described in the paper, in conclusion, “Anchor spraying in time, steel-rack sealing, steel pipe lap-welding, otter board combining, slump blocking, and dense refilling”. TBM excavating through the section of unfavorable geological condition smoothly and safely was validated in Taohuapu No.1 tunnel construction

About this research paper

What this paper is about

Research purposes: Two sets of TB880E TBM manufactured by German Wirth Corporation were introduced in 1997 by the Railway Ministry. These machines’ structures and technical data were designed according to Qinling Super Long Tunnel of Xi’an-Ankang Railway, which were applicable to excavating construction of hard rock tunnel, that was, Open Hard Rock Tunnel Boring Machine (TBM). It is still a difficult problem suffering the world to excavate through the soft surrounding rock. Research methods:This paper researched the preventive measures and construction methods on TBM construction accidents in terms of Taohuapu No.1 tunnel construction practice of Xi’an-Nanjing Railway. Research conclusions:This paper proposed a 20-Chinese-word principle, “Advance prediction, lining construction, data adjustment, proper promotion, and disturbance reduction”. How to deal with landslide was also described in the paper, in conclusion, “Anchor spraying in time, steel-rack sealing, steel pipe lap-welding, otter board combining, slump blocking, and dense refilling”. TBM excavating through the section of unfavorable geological condition smoothly and safely was validated in Taohuapu No.1 tunnel construction

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Research purposes: Two sets of TB880E TBM manufactured by German Wirth Corporation were introduced in 1997 by the Railway Ministry. These machines’ structures and technical data were designed according to Qinling Super Long Tunnel of Xi’an-Ankang Railway, which were applicable to excavating construction of hard rock tunnel, that was, Open Hard Rock Tunnel Boring Machine (TBM). It is still a difficult problem suffering the world to excavate through the soft surrounding rock. Research methods:This paper researched the preventive measures and construction methods on TBM construction accidents in terms of Taohuapu No.1 tunnel construction practice of Xi’an-Nanjing Railway. Research conclusions:This paper proposed a 20-Chinese-word principle, “Advance prediction, lining construction, data adjustment, proper promotion, and disturbance reduction”. How to deal with landslide was also described in the paper, in conclusion, “Anchor spraying in time, steel-rack sealing, steel pipe lap-welding, otter board combining, slump blocking, and dense refilling”. TBM excavating through the section of unfavorable geological condition smoothly and safely was validated in Taohuapu No.1 tunnel construction

Key concepts: Engineering, Tunnel construction, Slump, Mining engineering, Tunnel boring machine, Civil engineering, Three gorges, Christian ministry