On application research of bored pile embedded rock in intensifying and maintenance project in wharf
Xia Ping-hu
Abstract
Xia Ping-hu
Abstract
By combining with factual projects,the paper researches on the application of bored pile embedded rock in intensifying project in wharf,points out the thoughts and scheme for the factual maintenance design,analyzes the uneven settlement treatment,points out the whole stability settlement of the wharf's bent structure.It is shown by the project that the adoption of bored pile embedded rock is effective for the intensification of wharf.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
By combining with factual projects,the paper researches on the application of bored pile embedded rock in intensifying project in wharf,points out the thoughts and scheme for the factual maintenance design,analyzes the uneven settlement treatment,points out the whole stability settlement of the wharf's bent structure.It is shown by the project that the adoption of bored pile embedded rock is effective for the intensification of wharf.
Key concepts: Wharf, Pile, Settlement (finance), Engineering, Bent molecular geometry, Civil engineering, Geotechnical engineering, Forensic engineering