2012Shanxi ArchitectureRequires access

Theoretical analysis and calculation of foundation settlement of prestressed pipe pile on high-speed highway

Xiao Shi-we

Open publisher page 0 citations

Abstract

This paper firstly analyzes settlement calculation theory model after the treatment of high-speed highway roadbed pipe pile,compares the settlement calculation difference between common pile foundation and composite pile foundation,and determines settlement calculation of pipe pile according to common pile foundation.Secondly,it calculates and analyzes roadbed settlement after treatment according to different pile length,pile distance,and pile diameter of common pile foundation.In the end,through calculation,it finds out that the reinforcement with pipe pile can effectively control the roadbed settlement,pile diameter doesn't has great impact on the settlement,pile distance has obvious impact on the settlement,pile length has obvious impact on settlement in certain length scope.

About this research paper

What this paper is about

This paper firstly analyzes settlement calculation theory model after the treatment of high-speed highway roadbed pipe pile,compares the settlement calculation difference between common pile foundation and composite pile foundation,and determines settlement calculation of pipe pile according to common pile foundation.Secondly,it calculates and analyzes roadbed settlement after treatment according to different pile length,pile distance,and pile diameter of common pile foundation.In the end,through calculation,it finds out that the reinforcement with pipe pile can effectively control the roadbed settlement,pile diameter doesn't has great impact on the settlement,pile distance has obvious impact on the settlement,pile length has obvious impact on settlement in certain length scope.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper firstly analyzes settlement calculation theory model after the treatment of high-speed highway roadbed pipe pile,compares the settlement calculation difference between common pile foundation and composite pile foundation,and determines settlement calculation of pipe pile according to common pile foundation.Secondly,it calculates and analyzes roadbed settlement after treatment according to different pile length,pile distance,and pile diameter of common pile foundation.In the end,through calculation,it finds out that the reinforcement with pipe pile can effectively control the roadbed settlement,pile diameter doesn't has great impact on the settlement,pile distance has obvious impact on the settlement,pile length has obvious impact on settlement in certain length scope.

Key concepts: Pile, Settlement (finance), Foundation (evidence), Geotechnical engineering, Engineering, Geography, Archaeology, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Theoretical analysis and calculation of foundation settlement of prestressed pipe pile on high-speed highway — Research Paper | ScholarLens