2008Journal of Sediment ResearchRequires access

Influence of reservoir construction upstream on the navigation channel in the fluctuating backwater area of the Three Gorges Reservoir

Xie Bao-ling

Open publisher page 2 citations

Abstract

Through analyzing the sedimentation process and distribution in Chongqing reach with/without reservoir construction upstream,the influence of reservoir construction upstream on the water level and the navigation channel in the fluctuating backwater area of the Three Gorges Reservoir are studied.The results show that the Chongqing reach will become the main obstructive shipping area with the regulation works and the headwater extension of backwater at operation level 155m.Under the function of the upper reservoirs,the deposition in main stem Chongqing reach will greatly decrease,even erosion could be observed,which will help a lot to improve the navigation channel.However,building reservoir upstream has a little influence on the navigation condition in Jinshaqi reach.

About this research paper

What this paper is about

Through analyzing the sedimentation process and distribution in Chongqing reach with/without reservoir construction upstream,the influence of reservoir construction upstream on the water level and the navigation channel in the fluctuating backwater area of the Three Gorges Reservoir are studied.The results show that the Chongqing reach will become the main obstructive shipping area with the regulation works and the headwater extension of backwater at operation level 155m.Under the function of the upper reservoirs,the deposition in main stem Chongqing reach will greatly decrease,even erosion could be observed,which will help a lot to improve the navigation channel.However,building reservoir upstream has a little influence on the navigation condition in Jinshaqi reach.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Through analyzing the sedimentation process and distribution in Chongqing reach with/without reservoir construction upstream,the influence of reservoir construction upstream on the water level and the navigation channel in the fluctuating backwater area of the Three Gorges Reservoir are studied.The results show that the Chongqing reach will become the main obstructive shipping area with the regulation works and the headwater extension of backwater at operation level 155m.Under the function of the upper reservoirs,the deposition in main stem Chongqing reach will greatly decrease,even erosion could be observed,which will help a lot to improve the navigation channel.However,building reservoir upstream has a little influence on the navigation condition in Jinshaqi reach.

Key concepts: Three gorges, Upstream (networking), Channel (broadcasting), Sedimentation, Deposition (geology), Hydrology (agriculture), Erosion, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Influence of reservoir construction upstream on the navigation channel in the fluctuating backwater area of the Three Gorges Reservoir — Research Paper | ScholarLens