Rock Cutting by Controlled Blasting
Zhou Chang-lin
Abstract
Zhou Chang-lin
Abstract
A blasting project of 170 000 squares rock cutting on the mountain body inside the Longtan cement factory was introduced. The expected effect was achieved by selecting reasonable program,blasting parameters and successfully decreasing the influence the blasting would cause to the surrounding buildings.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A blasting project of 170 000 squares rock cutting on the mountain body inside the Longtan cement factory was introduced. The expected effect was achieved by selecting reasonable program,blasting parameters and successfully decreasing the influence the blasting would cause to the surrounding buildings.
Key concepts: Rock blasting, Factory (object-oriented programming), Geotechnical engineering, Mining engineering, Geology, Engineering, Computer science, Programming language