Application Study on New Controlled Blasting Techniques in Mutual Road Cross-bridge Project
Chen Lian-jin
Abstract
Chen Lian-jin
Abstract
According to the characteristics of the project,the new blasting techniques are used. Combining preslit blasting with press blasting, and time daley both inside with outside the holes,the blasting vibration and the fly rock are reduced and a good blasting result is achieved.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the characteristics of the project,the new blasting techniques are used. Combining preslit blasting with press blasting, and time daley both inside with outside the holes,the blasting vibration and the fly rock are reduced and a good blasting result is achieved.
Key concepts: Rock blasting, Bridge (graph theory), Engineering, Drilling and blasting, Forensic engineering, Mining engineering, Civil engineering, Geotechnical engineering