2006•Fire Control and Command ControlRequires access

Optimization of Preventive Maintenance Period based on GA

HU Hai-bao

Open publisher page 1 citations

Abstract

The change of preventive maintenance period followed maintenance times was considered.Taking into account the failure rate will increase with the rose of maintenance times,the recursion relationship of the failure rate before and after preventive maintenance was built up concerning with the concept of age reduction factor.This paper presents an optimization model of the preventive maintenance period based on GA.The rate of profit along with maintenance times was researched,with the result that effectively help to determine how the system will be replaced.

About this research paper

What this paper is about

The change of preventive maintenance period followed maintenance times was considered.Taking into account the failure rate will increase with the rose of maintenance times,the recursion relationship of the failure rate before and after preventive maintenance was built up concerning with the concept of age reduction factor.This paper presents an optimization model of the preventive maintenance period based on GA.The rate of profit along with maintenance times was researched,with the result that effectively help to determine how the system will be replaced.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The change of preventive maintenance period followed maintenance times was considered.Taking into account the failure rate will increase with the rose of maintenance times,the recursion relationship of the failure rate before and after preventive maintenance was built up concerning with the concept of age reduction factor.This paper presents an optimization model of the preventive maintenance period based on GA.The rate of profit along with maintenance times was researched,with the result that effectively help to determine how the system will be replaced.

Key concepts: Preventive maintenance, Reliability engineering, Failure rate, Preventive care, Proactive maintenance, Corrective maintenance, Engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimization of Preventive Maintenance Period based on GA — Research Paper | ScholarLens