Construction technology of steel truss and cable-stayed bridge cable on railway

Zongxi Zhang

Open publisher page 0 citations

Abstract

Through the calculation of stay-cables no stress length and traction,it was put forward that the short and long cable was respectively hanged by means of soft and hard traction.With the combination of technology of the bridge deck and leaved exhibition cable were cleverly used.The cable-stayed bridge with beam end show cable installation of the bridge gantry and bridge deck traction combined method.The above measures have been used to improve the installation of stay-cables efficiency and quality.

About this research paper

What this paper is about

Through the calculation of stay-cables no stress length and traction,it was put forward that the short and long cable was respectively hanged by means of soft and hard traction.With the combination of technology of the bridge deck and leaved exhibition cable were cleverly used.The cable-stayed bridge with beam end show cable installation of the bridge gantry and bridge deck traction combined method.The above measures have been used to improve the installation of stay-cables efficiency and quality.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Through the calculation of stay-cables no stress length and traction,it was put forward that the short and long cable was respectively hanged by means of soft and hard traction.With the combination of technology of the bridge deck and leaved exhibition cable were cleverly used.The cable-stayed bridge with beam end show cable installation of the bridge gantry and bridge deck traction combined method.The above measures have been used to improve the installation of stay-cables efficiency and quality.

Key concepts: Traction (geology), Deck, Structural engineering, Bridge (graph theory), Truss, Engineering, Beam bridge, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction technology of steel truss and cable-stayed bridge cable on railway — Research Paper | ScholarLens