Innovative Method for the Construction of Cable-Stayed Bridges by Cable Crane
Xiangmin Yu, De‐Wei Chen
Abstract
Xiangmin Yu, De‐Wei Chen
Abstract
Yachihe Bridge in China is a hybrid cable-stayed bridge with concrete decks at the side spans and a steel truss deck at the mid-span. The 800-m-long truss deck breaks a new record as the longest steel truss cable-stayed bridge in the world. Constrained by site terrain, poor transportation conditions and limited time, a cable crane was adopted for the erection of the 16-m-long truss deck segments, marking the first time that a cable crane has been used in the deck erection of a cable-stayed bridge. This paper primarily deals with the challenges faced and solutions formulated during the bridge construction process, and also presents field load tests for the cable crane.
OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Yachihe Bridge in China is a hybrid cable-stayed bridge with concrete decks at the side spans and a steel truss deck at the mid-span. The 800-m-long truss deck breaks a new record as the longest steel truss cable-stayed bridge in the world. Constrained by site terrain, poor transportation conditions and limited time, a cable crane was adopted for the erection of the 16-m-long truss deck segments, marking the first time that a cable crane has been used in the deck erection of a cable-stayed bridge. This paper primarily deals with the challenges faced and solutions formulated during the bridge construction process, and also presents field load tests for the cable crane.
Key concepts: Structural engineering, Engineering, Civil engineering, Forensic engineering