Roof displacement law and enforced roof caving technology for coal mining in seam with shallow depth
Liu Yang, Dang Xi-feng
Abstract
Liu Yang, Dang Xi-feng
Abstract
In order to provide the theoretical basis and technical base for the roof disaster prevention and control under the seam geological conditions with a mining depth of 200 m,based on the mining practices of the 2301 coal mining face in Yuyang Mine,with the site actual information summarization and the theoretical analysis method,the paper analyzed and calculated the main roof initial pressure and the pe- riodical pressure under the geological and mining conditions.The research showed that the roof of the coal mining face in Yuyang Mine was a flate type structure breaking.The initial pressure distance of the main roof was large and the hard roof in the goaf could form a large roof pressure,which would cause a hurricane to the safety mining production of the coal mining face.Therefore,a forced roof caving should be conducted to the roof during the initial mining period.The roof caving measure applied was a pre-eraeking blasting technology with deep boreholes to ensure the roof safety of the coal mining face during the initial mining period.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In order to provide the theoretical basis and technical base for the roof disaster prevention and control under the seam geological conditions with a mining depth of 200 m,based on the mining practices of the 2301 coal mining face in Yuyang Mine,with the site actual information summarization and the theoretical analysis method,the paper analyzed and calculated the main roof initial pressure and the pe- riodical pressure under the geological and mining conditions.The research showed that the roof of the coal mining face in Yuyang Mine was a flate type structure breaking.The initial pressure distance of the main roof was large and the hard roof in the goaf could form a large roof pressure,which would cause a hurricane to the safety mining production of the coal mining face.Therefore,a forced roof caving should be conducted to the roof during the initial mining period.The roof caving measure applied was a pre-eraeking blasting technology with deep boreholes to ensure the roof safety of the coal mining face during the initial mining period.
Key concepts: Roof, Coal mining, Mining engineering, Borehole, Coal, Longwall mining, Displacement (psychology), Extraction (chemistry)