On September,2003,October,2005 and July,2010,larger flood of 20 years frequency occurred in the middle and lower area of Hanjiang River,which caused dangers in the main levee of the Hanjiang River.In order to research the flood control countermeasures,the analysis on flood characteristics of the Hanjiang River,the flood control structure system and capacity in the middle and lower Hanjiang River are conducted.The preliminary analysis shows that the regulation of Danjiangkou Reservoir is complicated,flood control standard of main levee of the Hanjiang River is low,Dujiatai flood diversion works is not finished and the construction of flood storage polders still lag behind.The flood disaster of the Hanjiang River can be eliminated basically,only when Danjiangkou Reservoir and Dujiatai flood diversion works are completed in designed final scale,the main levee of Hanjiang River is heightened and reinforced,and flood storage polders are constructed meeting requirement.

About this research paper

What this paper is about

On September,2003,October,2005 and July,2010,larger flood of 20 years frequency occurred in the middle and lower area of Hanjiang River,which caused dangers in the main levee of the Hanjiang River.In order to research the flood control countermeasures,the analysis on flood characteristics of the Hanjiang River,the flood control structure system and capacity in the middle and lower Hanjiang River are conducted.The preliminary analysis shows that the regulation of Danjiangkou Reservoir is complicated,flood control standard of main levee of the Hanjiang River is low,Dujiatai flood diversion works is not finished and the construction of flood storage polders still lag behind.The flood disaster of the Hanjiang River can be eliminated basically,only when Danjiangkou Reservoir and Dujiatai flood diversion works are completed in designed final scale,the main levee of Hanjiang River is heightened and reinforced,and flood storage polders are constructed meeting requirement.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

On September,2003,October,2005 and July,2010,larger flood of 20 years frequency occurred in the middle and lower area of Hanjiang River,which caused dangers in the main levee of the Hanjiang River.In order to research the flood control countermeasures,the analysis on flood characteristics of the Hanjiang River,the flood control structure system and capacity in the middle and lower Hanjiang River are conducted.The preliminary analysis shows that the regulation of Danjiangkou Reservoir is complicated,flood control standard of main levee of the Hanjiang River is low,Dujiatai flood diversion works is not finished and the construction of flood storage polders still lag behind.The flood disaster of the Hanjiang River can be eliminated basically,only when Danjiangkou Reservoir and Dujiatai flood diversion works are completed in designed final scale,the main levee of Hanjiang River is heightened and reinforced,and flood storage polders are constructed meeting requirement.

Key concepts: Flood myth, Flood control, Levee, Hydrology (agriculture), Environmental science, Floodplain, Flood stage, 100-year flood