2002Science & Technology of Baotou Steel(Group) CorporationRequires access

Billet continuous casting process at Steelmaking Plant

Dong Zhi-ren

Open publisher page 0 citations

Abstract

No.1 billet continuous caster will be built at Steelmaking Plant. It is designed six-caster six-strand with the 150×150 mm billet production 700,000 tons per year and cut lengths is 12m, which can meet the requirements for High-speed Wiring Plant and provide base for five converters reaching continuous casting.

About this research paper

What this paper is about

No.1 billet continuous caster will be built at Steelmaking Plant. It is designed six-caster six-strand with the 150×150 mm billet production 700,000 tons per year and cut lengths is 12m, which can meet the requirements for High-speed Wiring Plant and provide base for five converters reaching continuous casting.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

No.1 billet continuous caster will be built at Steelmaking Plant. It is designed six-caster six-strand with the 150×150 mm billet production 700,000 tons per year and cut lengths is 12m, which can meet the requirements for High-speed Wiring Plant and provide base for five converters reaching continuous casting.

Key concepts: Steelmaking, Continuous casting, Caster, Engineering, Casting, Metallurgy, Steel mill, Process (computing)

Related papers

Back to paper searchBrowse research topicsOriginal source
Billet continuous casting process at Steelmaking Plant — Research Paper | ScholarLens