50t hoist and T2T80 double-level rotating holding pole were used to erect the N4 crossing tower in the Yellow River crossing section of Haminan Zhengzhou ±800kV UHVDC project,which could solve the difficulties of tower erection caused by tower's larger root distance,longer and heavier cross arm. The key technology of the N4 crossing tower erection was studied in detail,which could provide certain reference to the tower erection with long cross arm in UHVDC projects.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
50t hoist and T2T80 double-level rotating holding pole were used to erect the N4 crossing tower in the Yellow River crossing section of Haminan Zhengzhou ±800kV UHVDC project,which could solve the difficulties of tower erection caused by tower's larger root distance,longer and heavier cross arm. The key technology of the N4 crossing tower erection was studied in detail,which could provide certain reference to the tower erection with long cross arm in UHVDC projects.
Key concepts: Hoist (device), Tower, Engineering, Transmission line, Span (engineering), Structural engineering, Transmission tower, Electrical engineering