Delayed response model for bankfull area of the Gaocun Station on the Lower Yellow River

WU Bao-sheng

Open publisher page 1 citations

Abstract

Based on the concept that the rate of adjustment is proportional to the difference between the actual state and the equilibrium state of the channel,a delayed response model for bankfull area calculation at Gaocun station on the Lower Yellow River was developed.The method takes into account for the cumulative effect of previous years’flow and sediment conditions on the current year's bankfull discharge.The characteristics of delayed response of bankfull area to the flow and sediment conditions were analyzed.The results revealed that the current year's bankfull area is a result of the cumulative effect of several consecutive years'flow discharge and sediment load conditions.The cumulative effect of flow regime in the preceding years on the bankfull area is significant for the nearest 4 to 5 years,and it becomes smaller and smaller as time goes to the past.

About this research paper

What this paper is about

Based on the concept that the rate of adjustment is proportional to the difference between the actual state and the equilibrium state of the channel,a delayed response model for bankfull area calculation at Gaocun station on the Lower Yellow River was developed.The method takes into account for the cumulative effect of previous years’flow and sediment conditions on the current year's bankfull discharge.The characteristics of delayed response of bankfull area to the flow and sediment conditions were analyzed.The results revealed that the current year's bankfull area is a result of the cumulative effect of several consecutive years'flow discharge and sediment load conditions.The cumulative effect of flow regime in the preceding years on the bankfull area is significant for the nearest 4 to 5 years,and it becomes smaller and smaller as time goes to the past.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Based on the concept that the rate of adjustment is proportional to the difference between the actual state and the equilibrium state of the channel,a delayed response model for bankfull area calculation at Gaocun station on the Lower Yellow River was developed.The method takes into account for the cumulative effect of previous years’flow and sediment conditions on the current year's bankfull discharge.The characteristics of delayed response of bankfull area to the flow and sediment conditions were analyzed.The results revealed that the current year's bankfull area is a result of the cumulative effect of several consecutive years'flow discharge and sediment load conditions.The cumulative effect of flow regime in the preceding years on the bankfull area is significant for the nearest 4 to 5 years,and it becomes smaller and smaller as time goes to the past.

Key concepts: Hydrology (agriculture), Flow (mathematics), Sediment, Current (fluid), Channel (broadcasting), Geology, Cumulative effects, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Delayed response model for bankfull area of the Gaocun Station on the Lower Yellow River — Research Paper | ScholarLens