Very fast transient overvoltage(VFTO)in GIS has been abundantly researched in China and abroad.The technology is relatively mature,but there are still some technology problems in practical measure.Three practical measure methods for the very fast transient overvoltage that are inside outside very fast transient overvoltage and transient enclosure ground potential rise(TGPR)are introduced in this paper.This paper also gives the circuit breaker's VFTO measure dresults in switching of no-loaded lines for 750 kV CIS in eastern Lanzhou,which provide a direction for field measuring the very fast transient overvoltage.

About this research paper

What this paper is about

Very fast transient overvoltage(VFTO)in GIS has been abundantly researched in China and abroad.The technology is relatively mature,but there are still some technology problems in practical measure.Three practical measure methods for the very fast transient overvoltage that are inside outside very fast transient overvoltage and transient enclosure ground potential rise(TGPR)are introduced in this paper.This paper also gives the circuit breaker's VFTO measure dresults in switching of no-loaded lines for 750 kV CIS in eastern Lanzhou,which provide a direction for field measuring the very fast transient overvoltage.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Very fast transient overvoltage(VFTO)in GIS has been abundantly researched in China and abroad.The technology is relatively mature,but there are still some technology problems in practical measure.Three practical measure methods for the very fast transient overvoltage that are inside outside very fast transient overvoltage and transient enclosure ground potential rise(TGPR)are introduced in this paper.This paper also gives the circuit breaker's VFTO measure dresults in switching of no-loaded lines for 750 kV CIS in eastern Lanzhou,which provide a direction for field measuring the very fast transient overvoltage.

Key concepts: Overvoltage, Transient (computer programming), Circuit breaker, Electrical engineering, Transient analysis, Measure (data warehouse), Field (mathematics), Engineering