Field Research on Very Fast Transient Overvoltage in 750kV GIS Substation
Sen Wang
Abstract
Sen Wang
Abstract
Very fast transient overvoltage(VFTO)in GIS has been abundantly researched in China and abroad.The technology is relatively mature,but there are still some technology problems in practical measure.Three practical measure methods for the very fast transient overvoltage that are inside outside very fast transient overvoltage and transient enclosure ground potential rise(TGPR)are introduced in this paper.This paper also gives the circuit breaker's VFTO measure dresults in switching of no-loaded lines for 750 kV CIS in eastern Lanzhou,which provide a direction for field measuring the very fast transient overvoltage.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Very fast transient overvoltage(VFTO)in GIS has been abundantly researched in China and abroad.The technology is relatively mature,but there are still some technology problems in practical measure.Three practical measure methods for the very fast transient overvoltage that are inside outside very fast transient overvoltage and transient enclosure ground potential rise(TGPR)are introduced in this paper.This paper also gives the circuit breaker's VFTO measure dresults in switching of no-loaded lines for 750 kV CIS in eastern Lanzhou,which provide a direction for field measuring the very fast transient overvoltage.
Key concepts: Overvoltage, Transient (computer programming), Circuit breaker, Electrical engineering, Transient analysis, Measure (data warehouse), Field (mathematics), Engineering