Main Pier Construction and Monitoring of 270m Continuous Rigid Frame Bridge of Humen Bridge Secondary Sea-route
Piao Long
Abstract
Piao Long
Abstract
270m continuous rigid frame bridge of Humen bridge secondary sea-route was folded in June,1996,the precision of which is: the error of bridge axes is less than 5.5mm,the error of height is less than 3.3mm.The above-mentioned error is far less than the design demand 15mm,which validate the success of main pier construction and monitoring of secondary sea-route.The experiences deserves generalization and reference.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
270m continuous rigid frame bridge of Humen bridge secondary sea-route was folded in June,1996,the precision of which is: the error of bridge axes is less than 5.5mm,the error of height is less than 3.3mm.The above-mentioned error is far less than the design demand 15mm,which validate the success of main pier construction and monitoring of secondary sea-route.The experiences deserves generalization and reference.
Key concepts: Pier, Rigid frame, Bridge (graph theory), Structural engineering, Frame (networking), Generalization, Engineering, Marine engineering