2009HighwayRequires access

Construction Monitoring in Super-long Span Continuous Rigid Frame Bridge

Jie Yuan

Open publisher page 0 citations

Abstract

The construction monitoring process in a continuous rigid frame bridge named Heichonggou(98 m+180 m+98 m) on the Meng-Xin Expressway of the national trunk highway(GZ40) is intronduced.A great deal of data and measures are presented to supply the reference for same type bridge.

About this research paper

What this paper is about

The construction monitoring process in a continuous rigid frame bridge named Heichonggou(98 m+180 m+98 m) on the Meng-Xin Expressway of the national trunk highway(GZ40) is intronduced.A great deal of data and measures are presented to supply the reference for same type bridge.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The construction monitoring process in a continuous rigid frame bridge named Heichonggou(98 m+180 m+98 m) on the Meng-Xin Expressway of the national trunk highway(GZ40) is intronduced.A great deal of data and measures are presented to supply the reference for same type bridge.

Key concepts: Bridge (graph theory), Rigid frame, Span (engineering), Frame (networking), Structural engineering, Engineering, Mechanical engineering, Medicine

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Monitoring in Super-long Span Continuous Rigid Frame Bridge — Research Paper | ScholarLens