Measures for Raising the Rate of Putting into Service of High Pressure Heater for Turbine Generator Unit
Xu Hui
Abstract
Xu Hui
Abstract
Analyzed the reason of lower rate of putting into service of high pressure heater for extraction turbine generator unit in Thermal Power Plant, Shanghai Petroteum Chemistry Inc.. Some measures in the aspect of overhaul and operation were adopted, such as changing the material quality of drain pipe to the material quality of stainless steel, adopting the self - regulation liquid level controller with steam and liquid of two - phase flow and strict check system etc.. The economic benefits and the level of energy saving management are improved.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Analyzed the reason of lower rate of putting into service of high pressure heater for extraction turbine generator unit in Thermal Power Plant, Shanghai Petroteum Chemistry Inc.. Some measures in the aspect of overhaul and operation were adopted, such as changing the material quality of drain pipe to the material quality of stainless steel, adopting the self - regulation liquid level controller with steam and liquid of two - phase flow and strict check system etc.. The economic benefits and the level of energy saving management are improved.
Key concepts: Steam turbine, Engineering, Raising (metalworking), Generator (circuit theory), Turbine, Unit (ring theory), Thermal power station, Service (business)