SOME MEASURES OF LOWERING BOULDER YIELD IN LONG-HOLE BLASTING OF OPEN PITS
Yuan Xiang-quan
Abstract
Yuan Xiang-quan
Abstract
To lower the blasting boulder yield is an important technical consideration in designing rock blast program.Based on the analysis of situation and causes on which the blasting boulder occurs in borehole blasting of open pit,the paper determined some measures of lowering boulder yield of borehole blasting operation in mining open pits by taking explosive specific charge,blasthole spacing pattern,charge structure,stem length,millisecond interval and detonating into design of blasting program.The blasting with the controlling measures resulted in very satisfied effects in practice.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
To lower the blasting boulder yield is an important technical consideration in designing rock blast program.Based on the analysis of situation and causes on which the blasting boulder occurs in borehole blasting of open pit,the paper determined some measures of lowering boulder yield of borehole blasting operation in mining open pits by taking explosive specific charge,blasthole spacing pattern,charge structure,stem length,millisecond interval and detonating into design of blasting program.The blasting with the controlling measures resulted in very satisfied effects in practice.
Key concepts: Rock blasting, Explosive material, Borehole, Yield (engineering), Millisecond, Mining engineering, Drilling and blasting, Open-pit mining