2007•Unpublished venueRequires access

Technical Measures on Lowering Boulder Yield during Deep-hole Blast in Underground Mine

Lin Da-ze

Open publisher page 0 citations

Abstract

To lower blasted boulder yield is one of the most important technical considerations in deep-hole blasting operations of mine. The location, where blasted boulder occurs in drill hole blasting of underground mine, and its causes are analyzed in this paper. The influence of specific charge, hole arrangement, charge structure, stem length, millisecond interval and ignition mode on the yield of the blasted boulder is analyzed Some measures to lower boulder yield in deep hole blasting of underground mine are presented through the optimization of blasting operation parameters as follows: lowering deep hole blasting effect of geology structure, rationally determining specific charge, using technique of wide-space small burden blasting, technique of manifold charge structure and technique of millisecond compression blasting, strengthening the management of boring construction and blasting construction. Those measures bring about good results in engineering applications.

About this research paper

What this paper is about

To lower blasted boulder yield is one of the most important technical considerations in deep-hole blasting operations of mine. The location, where blasted boulder occurs in drill hole blasting of underground mine, and its causes are analyzed in this paper. The influence of specific charge, hole arrangement, charge structure, stem length, millisecond interval and ignition mode on the yield of the blasted boulder is analyzed Some measures to lower boulder yield in deep hole blasting of underground mine are presented through the optimization of blasting operation parameters as follows: lowering deep hole blasting effect of geology structure, rationally determining specific charge, using technique of wide-space small burden blasting, technique of manifold charge structure and technique of millisecond compression blasting, strengthening the management of boring construction and blasting construction. Those measures bring about good results in engineering applications.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To lower blasted boulder yield is one of the most important technical considerations in deep-hole blasting operations of mine. The location, where blasted boulder occurs in drill hole blasting of underground mine, and its causes are analyzed in this paper. The influence of specific charge, hole arrangement, charge structure, stem length, millisecond interval and ignition mode on the yield of the blasted boulder is analyzed Some measures to lower boulder yield in deep hole blasting of underground mine are presented through the optimization of blasting operation parameters as follows: lowering deep hole blasting effect of geology structure, rationally determining specific charge, using technique of wide-space small burden blasting, technique of manifold charge structure and technique of millisecond compression blasting, strengthening the management of boring construction and blasting construction. Those measures bring about good results in engineering applications.

Key concepts: Rock blasting, Drill hole, Deep hole, Yield (engineering), Mining engineering, Millisecond, Drilling and blasting, Drill

Related papers

Back to paper searchBrowse research topicsOriginal source
Technical Measures on Lowering Boulder Yield during Deep-hole Blast in Underground Mine — Research Paper | ScholarLens