2013Coal science and technologyRequires access

Study on Height Calculation of Water Conducted Fractured Zone Caused by Fully Mechanized Mining

Yin Shang

Open publisher page 6 citations

Abstract

According to Mining regulation under buildings,water body,railway,Practice has proved that the empirical formula for height of water conducted fractured zone in has been unable to fully meet the requirements for fully mechanized mining.In order to obtain more reliable empirical formulas,this paper collected a large number of domestic statistical data measured at different overburden strata conditions,fully considering the effect of mining thickness,mining depth,coal seam dip,work face length,and analysed the data by using the powerful SAS mathematical software.By comparing the results of different methods,this paper summarized that the empirical formula for height of water conducted fractured zone in under buildings,water,railway had large error at the conditions for fully mechanized mining.Choosing the precise empirical formula under the condition of fully mechanized mining had a guiding significance for the engineering practice.

About this research paper

What this paper is about

According to Mining regulation under buildings,water body,railway,Practice has proved that the empirical formula for height of water conducted fractured zone in has been unable to fully meet the requirements for fully mechanized mining.In order to obtain more reliable empirical formulas,this paper collected a large number of domestic statistical data measured at different overburden strata conditions,fully considering the effect of mining thickness,mining depth,coal seam dip,work face length,and analysed the data by using the powerful SAS mathematical software.By comparing the results of different methods,this paper summarized that the empirical formula for height of water conducted fractured zone in under buildings,water,railway had large error at the conditions for fully mechanized mining.Choosing the precise empirical formula under the condition of fully mechanized mining had a guiding significance for the engineering practice.

Why it matters

OpenAlex reports 6 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

According to Mining regulation under buildings,water body,railway,Practice has proved that the empirical formula for height of water conducted fractured zone in has been unable to fully meet the requirements for fully mechanized mining.In order to obtain more reliable empirical formulas,this paper collected a large number of domestic statistical data measured at different overburden strata conditions,fully considering the effect of mining thickness,mining depth,coal seam dip,work face length,and analysed the data by using the powerful SAS mathematical software.By comparing the results of different methods,this paper summarized that the empirical formula for height of water conducted fractured zone in under buildings,water,railway had large error at the conditions for fully mechanized mining.Choosing the precise empirical formula under the condition of fully mechanized mining had a guiding significance for the engineering practice.

Key concepts: Overburden, Coal mining, Mining engineering, Work (physics), Engineering, Civil engineering, Geology, Coal

Related papers

Back to paper searchBrowse research topicsOriginal source
Study on Height Calculation of Water Conducted Fractured Zone Caused by Fully Mechanized Mining — Research Paper | ScholarLens