Development Features and Max Height Calculation of Water Conducted Fractured Zone Caused by Fully Mechanized Top Coal Caving Mining
Teng Yong-hai
Abstract
Teng Yong-hai
Abstract
According to the information measured in different mining areas,the development law and features of the water conducted fractured zone under the conditions of the fully mechanized top coal caving mining were discussed.Calculation formula for the max height of the water conducted fractured zone under the fully mechanized top coal caving mining was studied in the paper.The results showed that under the condition of the fully mechanized top coal caving mining,the developed height of the water conducted fractured zone would be higher than the conventional coal mining and the fully mechanized slice mining and would be increased by 1.37 times and 2.31 times individually than the other two mining operations.The fractured height and mining thickness ratio of the fully mechanized top coal caving mining would be basically the same to the fractured height and mining thickness ratio of the primary mining in the slice mining and the development pattern of the water conducted fractured zone would be a saddle shape.During the fully mechanized top coal caving mining under the water bodies,the given calculation formula could be applied to calculate the max height of the water conducted fractured zone.
OpenAlex reports 6 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
According to the information measured in different mining areas,the development law and features of the water conducted fractured zone under the conditions of the fully mechanized top coal caving mining were discussed.Calculation formula for the max height of the water conducted fractured zone under the fully mechanized top coal caving mining was studied in the paper.The results showed that under the condition of the fully mechanized top coal caving mining,the developed height of the water conducted fractured zone would be higher than the conventional coal mining and the fully mechanized slice mining and would be increased by 1.37 times and 2.31 times individually than the other two mining operations.The fractured height and mining thickness ratio of the fully mechanized top coal caving mining would be basically the same to the fractured height and mining thickness ratio of the primary mining in the slice mining and the development pattern of the water conducted fractured zone would be a saddle shape.During the fully mechanized top coal caving mining under the water bodies,the given calculation formula could be applied to calculate the max height of the water conducted fractured zone.
Key concepts: Mining engineering, Coal mining, Coal, Geology, Geotechnical engineering, Petroleum engineering, Engineering, Waste management