Study on Temperature Field of Roller Compacted Concrete Gravity Dam during Construction
Hu Yong
Abstract
Hu Yong
Abstract
In this paper, Ansys software, a world wide popular common software used in finiteelement analysis, is suggested to simulate the temperature field of roller compacted concrete gravity dam during construction. According to a scheduled timetable of construction, temperature fields of a typical RCC gravity dam within construction period under several different construction conditions are calculated by simulating the layer constructing of the dam. The temperatures of placed RCC and air effect heavily on the temperature field of dam.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In this paper, Ansys software, a world wide popular common software used in finiteelement analysis, is suggested to simulate the temperature field of roller compacted concrete gravity dam during construction. According to a scheduled timetable of construction, temperature fields of a typical RCC gravity dam within construction period under several different construction conditions are calculated by simulating the layer constructing of the dam. The temperatures of placed RCC and air effect heavily on the temperature field of dam.
Key concepts: Gravity dam, Roller-compacted concrete, Geotechnical engineering, Engineering, Finite element method, Software, Structural engineering, Mass concrete