Design of a large-scale aqueduct in Middle Route Project of South-to-North Water Diversion

Qinghua Tang

Open publisher page 0 citations

Abstract

The designed flow of aqueduct of the main canal of South-to-North Water Diversion Middle Route Project was large.Through comparison of economic and technical indexes,the open box girder rectangular canal is adopted for a large-scale aqueduct,which is designed by 3-direction pre-stress.As the spatiality of the aqueduct force action,the cross-section selection and pre-stress were determined by plan bar system for the transversal and longitudinal calculation and the calculation results were checked by three-dimensional FEM.The non-linear thermal load and lateral wind load were mainly considered during check period.The results show that main parts of the aqueduct are in compressed state,and the local tensile stress is also in the scope of design code.

About this research paper

What this paper is about

The designed flow of aqueduct of the main canal of South-to-North Water Diversion Middle Route Project was large.Through comparison of economic and technical indexes,the open box girder rectangular canal is adopted for a large-scale aqueduct,which is designed by 3-direction pre-stress.As the spatiality of the aqueduct force action,the cross-section selection and pre-stress were determined by plan bar system for the transversal and longitudinal calculation and the calculation results were checked by three-dimensional FEM.The non-linear thermal load and lateral wind load were mainly considered during check period.The results show that main parts of the aqueduct are in compressed state,and the local tensile stress is also in the scope of design code.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The designed flow of aqueduct of the main canal of South-to-North Water Diversion Middle Route Project was large.Through comparison of economic and technical indexes,the open box girder rectangular canal is adopted for a large-scale aqueduct,which is designed by 3-direction pre-stress.As the spatiality of the aqueduct force action,the cross-section selection and pre-stress were determined by plan bar system for the transversal and longitudinal calculation and the calculation results were checked by three-dimensional FEM.The non-linear thermal load and lateral wind load were mainly considered during check period.The results show that main parts of the aqueduct are in compressed state,and the local tensile stress is also in the scope of design code.

Key concepts: Aqueduct, Water diversion, Structural engineering, Engineering, Finite element method, Precast concrete, Geotechnical engineering, Stress (linguistics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Design of a large-scale aqueduct in Middle Route Project of South-to-North Water Diversion — Research Paper | ScholarLens