2010•Journal of China HydrologyRequires access

Analysis of Relationship between Fluvial Process and Bank Caving in the Jingjiang Reach of Yangtze River

Yang Chao-yun

Open publisher page 1 citations

Abstract

The Jingjiang reach is located in the middle the Yangtze River.After the foundation of new China,with the continuous bank protection construction,the anti-scouring ability of riverbank has been strengthened,and then the lateral bed deformation has been controlled.However,channel regime has changed to a certain degree in some localities of the reach and there were great variations of lateral profiles at some sections,with frequent bank caving.This paper summarized the characteristics of recent fluvial process in the Jingjiang Reach,analyzed the relationship between fluvial process and bank caving with the observed data.The results show that the mainstream line changes and river channel erosion may induce bank caving,at the same time the lack of effective control of bank caving will affect the development of river regime.

About this research paper

What this paper is about

The Jingjiang reach is located in the middle the Yangtze River.After the foundation of new China,with the continuous bank protection construction,the anti-scouring ability of riverbank has been strengthened,and then the lateral bed deformation has been controlled.However,channel regime has changed to a certain degree in some localities of the reach and there were great variations of lateral profiles at some sections,with frequent bank caving.This paper summarized the characteristics of recent fluvial process in the Jingjiang Reach,analyzed the relationship between fluvial process and bank caving with the observed data.The results show that the mainstream line changes and river channel erosion may induce bank caving,at the same time the lack of effective control of bank caving will affect the development of river regime.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Jingjiang reach is located in the middle the Yangtze River.After the foundation of new China,with the continuous bank protection construction,the anti-scouring ability of riverbank has been strengthened,and then the lateral bed deformation has been controlled.However,channel regime has changed to a certain degree in some localities of the reach and there were great variations of lateral profiles at some sections,with frequent bank caving.This paper summarized the characteristics of recent fluvial process in the Jingjiang Reach,analyzed the relationship between fluvial process and bank caving with the observed data.The results show that the mainstream line changes and river channel erosion may induce bank caving,at the same time the lack of effective control of bank caving will affect the development of river regime.

Key concepts: Fluvial, Yangtze river, Bank, Geology, Channel (broadcasting), River regime, Hydrology (agriculture), Bank erosion

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis of Relationship between Fluvial Process and Bank Caving in the Jingjiang Reach of Yangtze River — Research Paper | ScholarLens