2006Unpublished venueRequires access

Technical analysis of the LNG plants with a capacity of 1.5 million m~3/d

Lng C, F Times

Open publisher page 0 citations

Abstract

A basic-load liquefied natural gas(LNG) plant,which has a largest scale in China till now,was built up and put into operation in 2004.Technical analysis is made to the technical processes,including pretreatment,liquefaction,storage and distribution of natural gas.

About this research paper

What this paper is about

A basic-load liquefied natural gas(LNG) plant,which has a largest scale in China till now,was built up and put into operation in 2004.Technical analysis is made to the technical processes,including pretreatment,liquefaction,storage and distribution of natural gas.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A basic-load liquefied natural gas(LNG) plant,which has a largest scale in China till now,was built up and put into operation in 2004.Technical analysis is made to the technical processes,including pretreatment,liquefaction,storage and distribution of natural gas.

Key concepts: Liquefied natural gas, Liquefaction, Natural gas, Environmental science, Natural-gas processing, Engineering, Scale (ratio), China

Related papers

Back to paper searchBrowse research topicsOriginal source
Technical analysis of the LNG plants with a capacity of 1.5 million m~3/d — Research Paper | ScholarLens