Precise Calculation Methods for Formation Pressure with Downhole Pressure Collection Joint
Yonggui Liu
Abstract
Yonggui Liu
Abstract
Calculation methods of under balanced formation pressure under existing technology and its defects are introduced. Down hole pressure collection joints are development. Air/liquid double phase pressure down the well was measured during well shut off through in situ test. A new formation pressure calculation method was established based on conventional well test theory and formation transfusion theory and using measured data. The method was established on pressure balance around well wall and the down hole pressure at balance point which was actually measured. It eliminated the errors caused by unstable casing and stand pipe pressure and imprecise drilling fluid density. It can precisely calculate the formation pressures along the borehole. The calculated pressure by the method is much closed to actual pressures. The calculation errors of well shut off pressure were down about 4%.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Calculation methods of under balanced formation pressure under existing technology and its defects are introduced. Down hole pressure collection joints are development. Air/liquid double phase pressure down the well was measured during well shut off through in situ test. A new formation pressure calculation method was established based on conventional well test theory and formation transfusion theory and using measured data. The method was established on pressure balance around well wall and the down hole pressure at balance point which was actually measured. It eliminated the errors caused by unstable casing and stand pipe pressure and imprecise drilling fluid density. It can precisely calculate the formation pressures along the borehole. The calculated pressure by the method is much closed to actual pressures. The calculation errors of well shut off pressure were down about 4%.
Key concepts: Casing, Borehole, Mechanics, Hydrostatic test, Joint (building), Pressure measurement, Drilling, Pressure system