2007•Journal of Oil and Gas TechnologyRequires access

Method for Determining Static Pressure for Horizontal Well Short-time Shut In

Wang Shuang-cai, Shiyu Jiang

Open publisher page 0 citations

Abstract

In consideration of the situation of no buildup test for horizontal wells because of condition restriction, it is proposed that the method of using unbalanced pressure to correct calculated formation pressure (static) during short-time shutin of maintenance. The method is theoretically reliable of easy operation, by which the bigger error induced when measured bottomhole pressure used instead of static formation pressure is avoided. It is used for data correction of horizontal wells of 2 unsaturated sandstone reservoirs in Tarim Oilfield, the accuracy of static pressure valve is obviously improved after the correction, by which reliable formation pressure data are provided for dynamic analysis of reservoirs and practical for horizontal well testing.

About this research paper

What this paper is about

In consideration of the situation of no buildup test for horizontal wells because of condition restriction, it is proposed that the method of using unbalanced pressure to correct calculated formation pressure (static) during short-time shutin of maintenance. The method is theoretically reliable of easy operation, by which the bigger error induced when measured bottomhole pressure used instead of static formation pressure is avoided. It is used for data correction of horizontal wells of 2 unsaturated sandstone reservoirs in Tarim Oilfield, the accuracy of static pressure valve is obviously improved after the correction, by which reliable formation pressure data are provided for dynamic analysis of reservoirs and practical for horizontal well testing.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In consideration of the situation of no buildup test for horizontal wells because of condition restriction, it is proposed that the method of using unbalanced pressure to correct calculated formation pressure (static) during short-time shutin of maintenance. The method is theoretically reliable of easy operation, by which the bigger error induced when measured bottomhole pressure used instead of static formation pressure is avoided. It is used for data correction of horizontal wells of 2 unsaturated sandstone reservoirs in Tarim Oilfield, the accuracy of static pressure valve is obviously improved after the correction, by which reliable formation pressure data are provided for dynamic analysis of reservoirs and practical for horizontal well testing.

Key concepts: Static pressure, Well test (oil and gas), Geology, Petroleum engineering, Hydrostatic test, Pressure measurement, Mechanics, Geotechnical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Method for Determining Static Pressure for Horizontal Well Short-time Shut In — Research Paper | ScholarLens