2011•Oil Drilling & Production TechnologyRequires access

Cementing technique without drilling fluid in wellbore

Liu Gao-jun

Open publisher page 0 citations

Abstract

For air drilling, drilling fluid need changing after well completion, to start cementing. But changing drilling fluid could not just waste material, but also cause problems, such as wellbore stability, circulation loss prevention, casing collapse, poor annular cementing quality, etc. By optimizing cement slurry properties, normal and reverse pumping cementing technology was taken to realize directly cementing operation after air drilling completion. After transforming drilling fluid for RIH with casing cementing operation, 100% cement slurry filling was realized. It not only saved cement but also secured safe operation and quality and shortened the well completion period. According 9 wells applications with maximum well depth of 3000 m, once cementing successful rate reached 100% and cementing quality rate was also 100%.

About this research paper

What this paper is about

For air drilling, drilling fluid need changing after well completion, to start cementing. But changing drilling fluid could not just waste material, but also cause problems, such as wellbore stability, circulation loss prevention, casing collapse, poor annular cementing quality, etc. By optimizing cement slurry properties, normal and reverse pumping cementing technology was taken to realize directly cementing operation after air drilling completion. After transforming drilling fluid for RIH with casing cementing operation, 100% cement slurry filling was realized. It not only saved cement but also secured safe operation and quality and shortened the well completion period. According 9 wells applications with maximum well depth of 3000 m, once cementing successful rate reached 100% and cementing quality rate was also 100%.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

For air drilling, drilling fluid need changing after well completion, to start cementing. But changing drilling fluid could not just waste material, but also cause problems, such as wellbore stability, circulation loss prevention, casing collapse, poor annular cementing quality, etc. By optimizing cement slurry properties, normal and reverse pumping cementing technology was taken to realize directly cementing operation after air drilling completion. After transforming drilling fluid for RIH with casing cementing operation, 100% cement slurry filling was realized. It not only saved cement but also secured safe operation and quality and shortened the well completion period. According 9 wells applications with maximum well depth of 3000 m, once cementing successful rate reached 100% and cementing quality rate was also 100%.

Key concepts: Casing, Lost circulation, Drilling fluid, Petroleum engineering, Wellbore, Drilling, Completion (oil and gas wells), Slurry