A new technology:Cementing in gas medium
Jiang Li
Abstract
Jiang Li
Abstract
Gas drilling technology is widely used in Sichuan oil and fields in recent years.It has played an important role in large ROP improvement,prevention of lost circulations and other drilling problems.To avoid lost circulation or wellbore instability when drilling fluid circulated downhole after gas drilling,or to shorten drilling cycle and reduce drilling costs,it is recognized that the cementing quality needs to be improved further.18 dry-hole(well with pure gas inside) cementing jobs have been tried in 339.7 mm and 244.5 mm holes in Sichuan and Chongqing oil or gas fields and a set of technology for dry-hole cementing after gas drilling is developed,including wellbore preparation,casing running,incontinuous liquid slurry injection,etc.And lost circulation prevention,wellbore instability prevention,and annulus plugging prevention are introduced.The application results prove the cementing quality is obviously improved by this new technology.And the cementing risks are low,the downhole accidents possibly caused by drilling fluid circulation after gas drilling can be eliminated.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Gas drilling technology is widely used in Sichuan oil and fields in recent years.It has played an important role in large ROP improvement,prevention of lost circulations and other drilling problems.To avoid lost circulation or wellbore instability when drilling fluid circulated downhole after gas drilling,or to shorten drilling cycle and reduce drilling costs,it is recognized that the cementing quality needs to be improved further.18 dry-hole(well with pure gas inside) cementing jobs have been tried in 339.7 mm and 244.5 mm holes in Sichuan and Chongqing oil or gas fields and a set of technology for dry-hole cementing after gas drilling is developed,including wellbore preparation,casing running,incontinuous liquid slurry injection,etc.And lost circulation prevention,wellbore instability prevention,and annulus plugging prevention are introduced.The application results prove the cementing quality is obviously improved by this new technology.And the cementing risks are low,the downhole accidents possibly caused by drilling fluid circulation after gas drilling can be eliminated.
Key concepts: Underbalanced drilling, Lost circulation, Petroleum engineering, Casing, Drilling, Drilling fluid, Annulus (botany), Wellbore