Practices on Gas Drainage with Cavity Completion Borehole Passing Through Soft and Outburst Seam
AN Hong-tao
Abstract
AN Hong-tao
Abstract
Based on the gas drainage practice experiences with an open hole completion of the surface coal bed methane well,the seam gas drainage production increasing mechanism with the cavity completion borehole through seam in underground mine was discussed and the cavity technology and the noted items of the borehole through the soft and outburst seam were analyzed.A site test and investigation was conducted in Hulu Sitai Mining Area.The test results showed that the cavity completion borehole through the seam could enlarge the influence scope of the drainage borehole,improve the gas drainage production,prolong the effective drainage time of the borehole and have other advantages.Within the 200 days' drainage period,the gas drainage quantity with the cavity completion borehole through seam would be 6.6 times higher than the borehole through seam.After 200 days' gas drainage,the gas drainage quantity with the cavity completion borehole through seam would be 61.6 m3/d and the gas drainage quantity with the borehole through seam would be 3.68 m3/d.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Based on the gas drainage practice experiences with an open hole completion of the surface coal bed methane well,the seam gas drainage production increasing mechanism with the cavity completion borehole through seam in underground mine was discussed and the cavity technology and the noted items of the borehole through the soft and outburst seam were analyzed.A site test and investigation was conducted in Hulu Sitai Mining Area.The test results showed that the cavity completion borehole through the seam could enlarge the influence scope of the drainage borehole,improve the gas drainage production,prolong the effective drainage time of the borehole and have other advantages.Within the 200 days' drainage period,the gas drainage quantity with the cavity completion borehole through seam would be 6.6 times higher than the borehole through seam.After 200 days' gas drainage,the gas drainage quantity with the cavity completion borehole through seam would be 61.6 m3/d and the gas drainage quantity with the borehole through seam would be 3.68 m3/d.
Key concepts: Borehole, Drainage, Coal mining, Geology, Completion (oil and gas wells), Petroleum engineering, Geotechnical engineering, Coal