2001•Fault-block Oil & Gas FieldOpen access

Research on Water Plugging Threshold of High Water Cut Wells & Zones of Zhongyuan Oilfield

Sinopec Henan

Open full text 0 citations

Abstract

Suitable water shutoff time of high water cot wells zones was researched based on aspects in which water shutoff may influence production of oil reservoir. The minimum of water cut in plugging formation is between 94 to 95 percent. The oil reservoirs, in which the horizontal contradiction of cil reservoir created by selection of injection production well pattern or reservoir heterogeneity is large, were plugged. The detailed factors of water shutoff and its limit was submitted combining with the practices in Zhongyuan Oilfield.

About this research paper

What this paper is about

Suitable water shutoff time of high water cot wells zones was researched based on aspects in which water shutoff may influence production of oil reservoir. The minimum of water cut in plugging formation is between 94 to 95 percent. The oil reservoirs, in which the horizontal contradiction of cil reservoir created by selection of injection production well pattern or reservoir heterogeneity is large, were plugged. The detailed factors of water shutoff and its limit was submitted combining with the practices in Zhongyuan Oilfield.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Suitable water shutoff time of high water cot wells zones was researched based on aspects in which water shutoff may influence production of oil reservoir. The minimum of water cut in plugging formation is between 94 to 95 percent. The oil reservoirs, in which the horizontal contradiction of cil reservoir created by selection of injection production well pattern or reservoir heterogeneity is large, were plugged. The detailed factors of water shutoff and its limit was submitted combining with the practices in Zhongyuan Oilfield.

Key concepts: Water cut, Petroleum engineering, Water reservoir, Oil production, Water injection (oil production), Environmental science, Oil well, Water well

Related papers

Back to paper searchBrowse research topicsOriginal source
Research on Water Plugging Threshold of High Water Cut Wells & Zones of Zhongyuan Oilfield — Research Paper | ScholarLens