2012•Hydropower Automation and Dam MonitoringRequires access

Economic Dispatch Control System of Cascade Hydropower Stations Based on a Universal Platform

Yan Yingfei

Open publisher page 0 citations

Abstract

To achieve the target of maximum energy reservation of cascade hydropower stations in the end of the calculation period,and in consideration of the constraints such as the joint vibration,an economic operation algorithm of cascade hydropower stations is determined,in which the starting-stopping of hydropower units and load distribution between hydropower stations are coordinated,improving the security,economy and real-time performance of real-time control of cascade hydropower stations.An economic dispatching control(EDC) software set of cascade hydropower stations based on the above algorithm and a universal platform for intelligent hydropower plant has been developed and successfully applied to the Songjianghe intelligent hydropower plant project.

About this research paper

What this paper is about

To achieve the target of maximum energy reservation of cascade hydropower stations in the end of the calculation period,and in consideration of the constraints such as the joint vibration,an economic operation algorithm of cascade hydropower stations is determined,in which the starting-stopping of hydropower units and load distribution between hydropower stations are coordinated,improving the security,economy and real-time performance of real-time control of cascade hydropower stations.An economic dispatching control(EDC) software set of cascade hydropower stations based on the above algorithm and a universal platform for intelligent hydropower plant has been developed and successfully applied to the Songjianghe intelligent hydropower plant project.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

To achieve the target of maximum energy reservation of cascade hydropower stations in the end of the calculation period,and in consideration of the constraints such as the joint vibration,an economic operation algorithm of cascade hydropower stations is determined,in which the starting-stopping of hydropower units and load distribution between hydropower stations are coordinated,improving the security,economy and real-time performance of real-time control of cascade hydropower stations.An economic dispatching control(EDC) software set of cascade hydropower stations based on the above algorithm and a universal platform for intelligent hydropower plant has been developed and successfully applied to the Songjianghe intelligent hydropower plant project.

Key concepts: Hydropower, Cascade, Reservation, Engineering, Control (management), Civil engineering, Control engineering, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Economic Dispatch Control System of Cascade Hydropower Stations Based on a Universal Platform — Research Paper | ScholarLens