Evaluation on operation management of cascade hydropower stations

Yi Zheng, X D Fu, Jiahua Wei, Xv Li

Open publisher page 0 citations

Abstract

An evaluation framework for joint operation of cascade hydropower stations was developed in this study. This framework is helpful to evaluate the operation performance of the cascade hydropower stations in order to improve the operation level. The power benefit of the cascade hydropower stations is chosen to be the evaluation object for multipurpose reservoirs and other targets are described as constraints according to the mandatory operation policy. The power generation is maximized by means of an optimal algorithm which is linked to a joint operation simulation model. This theoretical maximum power generation is introduced as an evaluative criterion to assess the indicated additional benefits compared with actual hydropower generation. In addition, an analysis module is involved to assess the influence of various factors on the operation performance. The developed framework was verified by the joint operation of the Three Gorges Project and Gezhouba cascade hydropower stations.

About this research paper

What this paper is about

An evaluation framework for joint operation of cascade hydropower stations was developed in this study. This framework is helpful to evaluate the operation performance of the cascade hydropower stations in order to improve the operation level. The power benefit of the cascade hydropower stations is chosen to be the evaluation object for multipurpose reservoirs and other targets are described as constraints according to the mandatory operation policy. The power generation is maximized by means of an optimal algorithm which is linked to a joint operation simulation model. This theoretical maximum power generation is introduced as an evaluative criterion to assess the indicated additional benefits compared with actual hydropower generation. In addition, an analysis module is involved to assess the influence of various factors on the operation performance. The developed framework was verified by the joint operation of the Three Gorges Project and Gezhouba cascade hydropower stations.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

An evaluation framework for joint operation of cascade hydropower stations was developed in this study. This framework is helpful to evaluate the operation performance of the cascade hydropower stations in order to improve the operation level. The power benefit of the cascade hydropower stations is chosen to be the evaluation object for multipurpose reservoirs and other targets are described as constraints according to the mandatory operation policy. The power generation is maximized by means of an optimal algorithm which is linked to a joint operation simulation model. This theoretical maximum power generation is introduced as an evaluative criterion to assess the indicated additional benefits compared with actual hydropower generation. In addition, an analysis module is involved to assess the influence of various factors on the operation performance. The developed framework was verified by the joint operation of the Three Gorges Project and Gezhouba cascade hydropower stations.

Key concepts: Cascade, Hydropower, Three gorges, Electricity generation, Computer science, Power (physics), Reliability engineering, Joint (building)

Related papers

Back to paper searchBrowse research topicsOriginal source
Evaluation on operation management of cascade hydropower stations — Research Paper | ScholarLens