The Crossing Construction of Gas Transmission Pipeline in Kalakashi River
Tieshan Wang
Abstract
Tieshan Wang
Abstract
A gas transmission pipeline served for Hetian Power Station with 355.6mm in diameter will cross over Kalakashi River in Xinjiang Province. According to the special geological conditions around the crossing area,the construction plan about trench digging,water draining and pipe towing is worked out. The project is successfully carried out within a month.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A gas transmission pipeline served for Hetian Power Station with 355.6mm in diameter will cross over Kalakashi River in Xinjiang Province. According to the special geological conditions around the crossing area,the construction plan about trench digging,water draining and pipe towing is worked out. The project is successfully carried out within a month.
Key concepts: Digging, Trench, Towing, Pipeline (software), Gas pipeline, Power station, Hydrology (agriculture), Pipeline transport