2012•Petroleum Engineering ConstructionRequires access

Design and Construction of Jing River Horizontal Opposite-directional Drilling Crossing Project of Second West to East Gas Pipeline

Zeng Zhi-hua

Open publisher page 0 citations

Abstract

The Jing River crossing in Jingyang County as a bottleneck engineering of the Second West to East Gas Pipeline Project is the completed long-distance horizontal opposite-directional drilling crossing with the biggest pipeline diameter in China,which has the overall length of 1 040 m and two parallel crossing steel pipelines,namely a main D 1 219 mm × 27.5 mm gas pipeline and a D 114 mm × 6.5 mm optical fiber cable casing.The crossing engineering encountered the complex geological layers of pebble,sand and powdery clay.The combinatorial construction scheme,i.e.large excavation of deep foundation pit for burying pipeline + long-distance temping casing + horizontal opposite-directional drilling crossing,was adopted,and many technical innovations were made.This HHD crossing engineering provides reference for design and construction of similar projects at home and abroad.

About this research paper

What this paper is about

The Jing River crossing in Jingyang County as a bottleneck engineering of the Second West to East Gas Pipeline Project is the completed long-distance horizontal opposite-directional drilling crossing with the biggest pipeline diameter in China,which has the overall length of 1 040 m and two parallel crossing steel pipelines,namely a main D 1 219 mm × 27.5 mm gas pipeline and a D 114 mm × 6.5 mm optical fiber cable casing.The crossing engineering encountered the complex geological layers of pebble,sand and powdery clay.The combinatorial construction scheme,i.e.large excavation of deep foundation pit for burying pipeline + long-distance temping casing + horizontal opposite-directional drilling crossing,was adopted,and many technical innovations were made.This HHD crossing engineering provides reference for design and construction of similar projects at home and abroad.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Jing River crossing in Jingyang County as a bottleneck engineering of the Second West to East Gas Pipeline Project is the completed long-distance horizontal opposite-directional drilling crossing with the biggest pipeline diameter in China,which has the overall length of 1 040 m and two parallel crossing steel pipelines,namely a main D 1 219 mm × 27.5 mm gas pipeline and a D 114 mm × 6.5 mm optical fiber cable casing.The crossing engineering encountered the complex geological layers of pebble,sand and powdery clay.The combinatorial construction scheme,i.e.large excavation of deep foundation pit for burying pipeline + long-distance temping casing + horizontal opposite-directional drilling crossing,was adopted,and many technical innovations were made.This HHD crossing engineering provides reference for design and construction of similar projects at home and abroad.

Key concepts: Directional drilling, Engineering, Drilling, Pipeline (software), Pipeline transport, Casing, Excavation, Bottleneck

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and Construction of Jing River Horizontal Opposite-directional Drilling Crossing Project of Second West to East Gas Pipeline — Research Paper | ScholarLens