The winter construction steps of second incline concrete of Lvliang mountain tunnel
Cheng Pen
Abstract
Cheng Pen
Abstract
Aiming at the construction difficulties of second incline concrete of Lvliang mountain tunnel,it sums up the winter construction experiences of concrete,and represents the steps should be adopted in the winter construction of tunnel second line concrete from the raw material of concrete,mixing,transfer,cast-in-place and maintain according to the meteorological phenomena data and geographical environment of Lvliang area,to supply reference.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Aiming at the construction difficulties of second incline concrete of Lvliang mountain tunnel,it sums up the winter construction experiences of concrete,and represents the steps should be adopted in the winter construction of tunnel second line concrete from the raw material of concrete,mixing,transfer,cast-in-place and maintain according to the meteorological phenomena data and geographical environment of Lvliang area,to supply reference.
Key concepts: Environmental science, Engineering, Civil engineering