2010Shanxi ArchitectureRequires access

Winter construction on Wolongshan tunnel exit of Zhun-Shuo railway

Zhu Kai-w

Open publisher page 0 citations

Abstract

Combining with actual construction condition of Wolongshan tunnel exit of Zhun-Shuo railway,this paper discusses the winter construction measures of tunnels,and carries on an analysis from three aspects,with a view to accumulate winter construction experience of tunnel engineering and to guarantee the tunnel construction quality.

About this research paper

What this paper is about

Combining with actual construction condition of Wolongshan tunnel exit of Zhun-Shuo railway,this paper discusses the winter construction measures of tunnels,and carries on an analysis from three aspects,with a view to accumulate winter construction experience of tunnel engineering and to guarantee the tunnel construction quality.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Combining with actual construction condition of Wolongshan tunnel exit of Zhun-Shuo railway,this paper discusses the winter construction measures of tunnels,and carries on an analysis from three aspects,with a view to accumulate winter construction experience of tunnel engineering and to guarantee the tunnel construction quality.

Key concepts: Tunnel construction, Railway tunnel, Quality (philosophy), Engineering, Civil engineering, Forensic engineering, Geotechnical engineering, Physics

Related papers

Back to paper searchBrowse research topicsOriginal source
Winter construction on Wolongshan tunnel exit of Zhun-Shuo railway — Research Paper | ScholarLens