2011Tunnel ConstructionRequires access

Construction Technology of Underpinning of Pile Foundations in Water: a Case in Construction of Chengdu Metro

Meng Qingjun

Open publisher page 0 citations

Abstract

The left tube of the shield-bored running tunnel from Chunxi Road Station to Dongmen Bridge Station on the second line of Chengdu Metro crosses the pile foundations of Dongmen Bridge.In order to ensure the successful boring of the shield,underpinning method is adopted.Countermeasures,such as building cofferdam in water,curtain grouting,dewatering,manual-cut holes and static blasting,are taken during construction,which brings the settlement of the bridge abutments under effective control and ensures the safety of the bridge,the utility lines and the pile foundation underpinning construction.

About this research paper

What this paper is about

The left tube of the shield-bored running tunnel from Chunxi Road Station to Dongmen Bridge Station on the second line of Chengdu Metro crosses the pile foundations of Dongmen Bridge.In order to ensure the successful boring of the shield,underpinning method is adopted.Countermeasures,such as building cofferdam in water,curtain grouting,dewatering,manual-cut holes and static blasting,are taken during construction,which brings the settlement of the bridge abutments under effective control and ensures the safety of the bridge,the utility lines and the pile foundation underpinning construction.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The left tube of the shield-bored running tunnel from Chunxi Road Station to Dongmen Bridge Station on the second line of Chengdu Metro crosses the pile foundations of Dongmen Bridge.In order to ensure the successful boring of the shield,underpinning method is adopted.Countermeasures,such as building cofferdam in water,curtain grouting,dewatering,manual-cut holes and static blasting,are taken during construction,which brings the settlement of the bridge abutments under effective control and ensures the safety of the bridge,the utility lines and the pile foundation underpinning construction.

Key concepts: Underpinning, Engineering, Pile, Bridge (graph theory), Cofferdam, Shield, Foundation (evidence), Civil engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Construction Technology of Underpinning of Pile Foundations in Water: a Case in Construction of Chengdu Metro — Research Paper | ScholarLens