Use of FGD gypsum in wall materials
Wang Xiaob
Abstract
Wang Xiaob
Abstract
The paper introduces a kind of composite block made of concrete,slag,fly ash,and FGD gypsum as main raw material.And researches on the preparation and performance of the FGD gypsum,and analyses the fineness,setting time,2 h mechanical strength of the building gypsum.The test shows that the performance of building gypsum calcined 3.5 h at 165 ℃ is optimal.The optimal batch is 12.5 % of cement,12 % of slag,10 % of fly ash.Curing age is 7d.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The paper introduces a kind of composite block made of concrete,slag,fly ash,and FGD gypsum as main raw material.And researches on the preparation and performance of the FGD gypsum,and analyses the fineness,setting time,2 h mechanical strength of the building gypsum.The test shows that the performance of building gypsum calcined 3.5 h at 165 ℃ is optimal.The optimal batch is 12.5 % of cement,12 % of slag,10 % of fly ash.Curing age is 7d.
Key concepts: Gypsum, Fineness, Fly ash, Raw material, Cement, Waste management, Calcination, Portland cement