Optimization and application of the temporary cemented filling system in Hemushan Iron Mine
Wenbin Xu
Abstract
Wenbin Xu
Abstract
Upward-lane-filling mining method is used in Houguanyinshan Ore Block of Hemushan Iron Mine,and safe,efficient and timely filling to the mined-out area are the first premise of mining success.However,in the process of actual production in mines,mining production ability and filling ability can't match well,leading to mining capacity severely constrained.Therefore,considering the stope safety,production capacity,improving mining capacity and economic benefits,filling system is optimized,which gets a satisfied production and filling effect.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Upward-lane-filling mining method is used in Houguanyinshan Ore Block of Hemushan Iron Mine,and safe,efficient and timely filling to the mined-out area are the first premise of mining success.However,in the process of actual production in mines,mining production ability and filling ability can't match well,leading to mining capacity severely constrained.Therefore,considering the stope safety,production capacity,improving mining capacity and economic benefits,filling system is optimized,which gets a satisfied production and filling effect.
Key concepts: Production (economics), Mining engineering, Process (computing), Block (permutation group theory), Engineering, Mine safety, Waste management, Coal mining