2014Shuiwen dizhi gongcheng dizhiRequires access

Optimization design model of fill slope in construction site based on expected investment

LI Yuan-ya

Open publisher page 0 citations

Abstract

Optimization design of fill slope is an important issue for the fill slope safety and risk assessment in construction site.Firstly,According to the characteristics of construction site engineering,this paper proposes a fill slope optimization design model based on the minimum expected cost as the objective function,and constructs the main design variables and constraints of this optimization design model.Secondly,this paper summarizes that during the previous survey process the design must contact with the construction plan,and must consider the random distribution of the design parameters and the applicability of the design.Finally,the optimization model is applied to a fill slope design of construction site engineering located in Ertang manganese mine,Pingle County,Guangxi.For the instance,the optimal fill slope angle of the different heights and the minimum expected unit cost are proposed.And,there is a positive linear correlation between the project cost and design slope height,while the optimal slope angle and the design slope height appear in a negative correlation for the fill slope in the Ertang manganese mine.The research provides a practical model for the optimization design of fill slope in construction site engineering,and has value for improving the risk assessment theory of fill slope.

About this research paper

What this paper is about

Optimization design of fill slope is an important issue for the fill slope safety and risk assessment in construction site.Firstly,According to the characteristics of construction site engineering,this paper proposes a fill slope optimization design model based on the minimum expected cost as the objective function,and constructs the main design variables and constraints of this optimization design model.Secondly,this paper summarizes that during the previous survey process the design must contact with the construction plan,and must consider the random distribution of the design parameters and the applicability of the design.Finally,the optimization model is applied to a fill slope design of construction site engineering located in Ertang manganese mine,Pingle County,Guangxi.For the instance,the optimal fill slope angle of the different heights and the minimum expected unit cost are proposed.And,there is a positive linear correlation between the project cost and design slope height,while the optimal slope angle and the design slope height appear in a negative correlation for the fill slope in the Ertang manganese mine.The research provides a practical model for the optimization design of fill slope in construction site engineering,and has value for improving the risk assessment theory of fill slope.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Optimization design of fill slope is an important issue for the fill slope safety and risk assessment in construction site.Firstly,According to the characteristics of construction site engineering,this paper proposes a fill slope optimization design model based on the minimum expected cost as the objective function,and constructs the main design variables and constraints of this optimization design model.Secondly,this paper summarizes that during the previous survey process the design must contact with the construction plan,and must consider the random distribution of the design parameters and the applicability of the design.Finally,the optimization model is applied to a fill slope design of construction site engineering located in Ertang manganese mine,Pingle County,Guangxi.For the instance,the optimal fill slope angle of the different heights and the minimum expected unit cost are proposed.And,there is a positive linear correlation between the project cost and design slope height,while the optimal slope angle and the design slope height appear in a negative correlation for the fill slope in the Ertang manganese mine.The research provides a practical model for the optimization design of fill slope in construction site engineering,and has value for improving the risk assessment theory of fill slope.

Key concepts: Engineering design process, Engineering, Optimal design, Civil engineering, Mathematics, Statistics, Mechanical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Optimization design model of fill slope in construction site based on expected investment — Research Paper | ScholarLens