Planning and design of construction diversion for Xiangjiaba Hydropower Station

Yang Shang-wen

Open publisher page 0 citations

Abstract

In light of the special natural conditions and project layout characteristics of Xiangjiaba Hydropower Station,a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout,late-stage flood control,navigation during the construction,and the construction period before the commissioning of the first hydropower generating unit.The construction scheme is briefly introduced herein,and furthermore,the diversion structures,the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the Stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the Stage 2 diversion are described as well.

About this research paper

What this paper is about

In light of the special natural conditions and project layout characteristics of Xiangjiaba Hydropower Station,a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout,late-stage flood control,navigation during the construction,and the construction period before the commissioning of the first hydropower generating unit.The construction scheme is briefly introduced herein,and furthermore,the diversion structures,the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the Stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the Stage 2 diversion are described as well.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In light of the special natural conditions and project layout characteristics of Xiangjiaba Hydropower Station,a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout,late-stage flood control,navigation during the construction,and the construction period before the commissioning of the first hydropower generating unit.The construction scheme is briefly introduced herein,and furthermore,the diversion structures,the composite scheme consisting of open caisson group adopted to treat the overburden of the foundation for the Stage 2 longitudinal concrete cofferdam and the diversion method of bottom outlet combined with the dam gap used for the Stage 2 diversion are described as well.

Key concepts: Hydropower, Cofferdam, Water diversion, Stage (stratigraphy), Civil engineering, Engineering, Unit (ring theory), Flood myth

Related papers

Back to paper searchBrowse research topicsOriginal source
Planning and design of construction diversion for Xiangjiaba Hydropower Station — Research Paper | ScholarLens